Co. No. 604938-M ISO 9001:2015 Certified (Cert. 220926016026) Established 2003
Established 2003 · Kuala Lumpur, Malaysia

Precision Industrial Piping, Hook-Up & Cleanroom Engineering

Thermo Logical Engineering Sdn. Bhd. delivers ISO 9001:2015 certified mechanical, specialty process piping, equipment hook-up, cleanroom retrofit, and Make-Up Air Unit (MAU) solutions engineered for reliability and a Green and Sustainable Future.

ISO 9001:2015 Certified QMS · Cert. 220926016026
Since 2003 23+ Years Track Record
Green & Sustainable Future-Ready Facilities
Cleanroom utility corridor with gleaming stainless steel and copper process piping manifolds
Registered Entity · Malaysia
THERMO LOGICAL ENGINEERING SDN. BHD.
Registration
604938-M
2003.
Year Established
Over two decades serving industrial & cleanroom facilities
06+
Core Engineering Disciplines
Hook-up, CDA/N2, LN2, chilled water, cleanrooms & MAU
ISO 9001
2015 Certified QMS
Certified by ARS Assessment (UAF / IAF accredited CB)
KL & MY
Plaza Puchong HQ
Serving manufacturing hubs across Klang Valley & Malaysia
Engineering Capabilities

Specialized Mechanical & Process Utility Execution

From ultra-clean gas manifolds and cryogenic liquid nitrogen lines to full machine hook-ups, cleanroom retrofits, and MAU replacements—every scope is delivered under documented QA/QC control.

CAP-01

MACHINE HOOK-UP

Equipment installation and connection

Precision machine positioning, leveling, and complete point-of-use utility tie-ins for production lines, semiconductor tools, and process skids.

Rigging & Alignment POU Tie-Ins Commissioning
CAP-02

CDA & N2 PIPING

Copper and stainless steel piping installation

Clean Dry Air (CDA) and Nitrogen (N2) distribution systems fabricated with purged TIG/orbital welding and brazed copper assemblies for zero-leak performance.

SS304 / SS316L Brazed Copper Leak Tested
CAP-03

LN2 PIPING

LN2 piping installation

Cryogenic Liquid Nitrogen (LN2) piping installations incorporating thermal contraction loops, vapor-barrier insulation, cryogenic valves, and safety relief headers.

Cryogenic Lines Thermal Relief Insulated SS
CAP-04

WATER PIPING

Chilled water and raw water systems

Closed-loop Chilled Water (CHW), Process Cooling Water (PCW), and Raw Water distribution with pump skids, thermal insulation, hydrostatic testing, and balancing.

CHW & PCW Raw Water Hydro-Tested
CAP-05

CLEANROOM & BUILDING

Cleanroom retrofit and building expansion

Controlled-environment retrofits, modular cleanroom partitioning, FFU/HEPA integration, and industrial building expansions executed with minimal plant downtime.

Cleanroom Retrofit Bay Expansion MEP Integration
CAP-06

MAU INSTALLATION

Dismantling and installation

Safe dismantling of legacy Make-Up Air Units (MAU), heavy rigging, structural mounting, chilled-water & ductwork tie-ins, and airflow balancing.

Dismantling Rigging & Plinth Airflow Tie-In
Stainless steel, copper, and insulated cryogenic process piping manifolds connected to cleanroom equipment
How We Deliver

Structured Project Execution from Survey to Handover

Project References

Completed Site Installations & Field Track Record

Real field execution across cryogenic LN2 VJP lines, cleanroom utility droppers, machine hook-up stanchions, MAU & cooling tower plants, and cleanroom expansions. Click any photo to inspect full view.

REF-01 // CRYOGENIC LN2 VJP

LN2 Vacuum-Jacketed Pipe (VJP) Line & Flex Hose Drop

Overhead stainless-steel LN2 VJP trunk routing, floor-anchored powder-coated stanchion support, cryogenic purge/vent valve assembly, and braided stainless flexible transfer hose connection.

LN2 VJP Line Cryogenic Valve Braided Flex Hose
REF-02 // UTILITY HEADER

Multi-Utility Wall Header & Dropper Manifold

Precision-aligned copper and stainless steel process utility headers with point-of-use brass/ball isolation valves, stainless & PVC exhaust take-offs, and power busway trunking.

Copper & SS Piping POU Isolation Valves Exhaust Take-Offs
REF-03 // TOOL HOOK-UP DROPS

Production Floor Powder-Coated Utility Stanchions & Service Drops

Ceiling-to-floor powder-coated hook-up stanchions outfitted with pre-terminated utility umbilicals, utility junction enclosures, and point-of-use isolation valves across the production bay.

Machine Hook-Up Powder-Coated Stanchions Junction Enclosures
REF-04 // CLEANROOM UTILITY GRID

Cleanroom Powder-Coated Machine Hook-Up Stanchion Array

Finished multi-row powder-coated utility stanchion grid anchored cleanly to antistatic cleanroom flooring, coordinated with ceiling FFU/HEPA panels and ready for production equipment placement.

Powder-Coated Stanchions Tool-Ready Prep Cleanroom Integration
REF-05 // MAU & HYDRONIC TIE-IN

Make-Up Air Unit (MAU) & Chilled Water Header Installation

Modular industrial MAU rigging and structural plinth mounting with insulated chilled-water supply/return headers, butterfly isolation valves, stainless drain piping, and overhead air duct connections.

MAU Rigging Chilled Water Tie-In Ductwork Integration
REF-06 // HYDRONIC MANIFOLD

MAU Hydronic Valve Manifold & Chilled Water Integration

Precision coil-piping manifold assembly featuring flanged Y-strainers, isolation valves, differential pressure instrumentation, aluminum-clad insulated risers, and condensate drain routing.

Valve Assembly Pressure Gauges Thermal Cladding
REF-07 // COOLING TOWER PLANT

Cooling Tower Installation & Condenser Water Headers

Complete outdoor cooling tower erection on concrete plinths, galvanized steel maintenance catwalk & safety cage ladder, large-bore condenser water headers, butterfly valves, and fire-line pipework.

Cooling Tower Condenser Piping Access Platform
REF-08 // CLEANROOM EXPANSION

Cleanroom Production Hall Retrofit & Expansion

Wide-span controlled-environment facility expansion incorporating modular insulated cleanroom wall panels, flush ceiling lighting & HEPA/return grids, antistatic flooring, and dual airlock doors.

Modular Partitioning Ceiling & HEPA Grid Airlock Doors
REF-09 // PASS-THROUGH & M&E

Cleanroom Bay & Inline Pass-Through Wall Construction

Controlled-environment corridor buildout integrating multi-bay stainless steel pass-through chambers, cleanroom ceiling troffers, column-mounted M&E control panels, and sealed flooring prior to handover.

Pass-Through Chambers M&E Integration Turnkey Handover
REF-10 // COMMAND CENTRE

Cleanroom Command & Monitoring Centre Construction

Purpose-built glass-enclosed cleanroom control room featuring flush structural glazing, integrated multi-screen monitoring wall & console housing, cleanroom ceiling integration, and sealed entry door.

Cleanroom Fit-Out Control Console Flush Glazing
REF-11 // DSC ROOM EXPANSION

DSC Room Civil & Structural Steel Building Expansion

Dedicated industrial facility room construction combining reinforced concrete slab works, masonry enclosure walls, structural steel I-beam roof framing with cross-bracing, and metal roof decking.

Building Expansion Structural Steel Civil & Enclosure
REF-12 // MSB ROOM & CO₂ SYSTEM

MSB Room Construction with CO₂ Suppression System

Main Switchboard (MSB) room fit-out featuring CO₂ fire suppression cylinder & overhead discharge piping, galvanized cable trays, fire-alarm conduits, and epoxy flooring with switchgear bay markings.

MSB Room Fit-Out CO₂ Fire System M&E Cable Trays
Quality Management System

ISO 9001:2015 Certified Engineering Discipline

Certified to ISO 9001:2015 by ARS Assessment Private Limited (accredited by UAF · CB-MS-3923, IAF MLA Member), Thermo Logical Engineering Sdn. Bhd. maintains rigorous quality verification across mechanical & electrical engineering, thermo piping, and construction works.

QA-01 // TRACEABILITY

Certified Materials

Mill test certificates and verified fittings for SS304, SS316L, copper, and cryogenic assemblies.

QA-02 // INTEGRITY

Pressure & Leak Verification

Documented pneumatic hold tests, hydrostatic pressure tests, and joint integrity logs.

QA-03 // CLEANLINESS

Cleanroom Discipline

Contamination-controlled work zones, nitrogen-purged welding, and capped piping storage.

QA-04 // SAFETY

Site & Rigging Safety

Structured dismantling, rigging plans, lockout/tagout coordination, and hazard controls.

ISO 9001:2015 CERTIFIED QMS · IAF CODE 28, 34
Cert. No. 220926016026
Reg. 22 Sept 2026 · 3-Yr Cycle
Registered Certification Scope
Provision of Mechanical and Electrical Engineering Services, including Thermo Piping and Construction Works.
  • Standardized Inspection Checklists: Every hook-up and piping run passes multi-stage sign-off before commissioning.
  • Consistent Craftsmanship: Skilled fitters, TIG welders, and cleanroom technicians trained in industrial tolerances.
  • Transparent Documentation: As-built markups, pressure test reports, and handover dossiers delivered upon completion.
  • Management Accountability: Direct engineering oversight from project scoping through final client sign-off.
Issued by ARS Assessment Private Limited
Our Commitment

Green and Sustainable Future

Industrial utilities account for a substantial share of plant energy consumption. Our engineering focuses on leak-free gas distribution, insulated thermal loops, and high-efficiency air handling upgrades that reduce waste and extend facility lifecycles.

Zero-Leak CDA & Nitrogen Efficiency

Precision-welded stainless and brazed copper networks eliminate costly compressed air and process gas leaks.

Thermal Loss Prevention in CHW & LN2

Properly vapor-sealed insulation on chilled water and cryogenic LN2 lines lowers chiller load and boil-off losses.

Modern MAU & Cleanroom Retrofits

Upgrading legacy Make-Up Air Units and cleanroom envelopes improves airflow efficiency without rebuilding from scratch.

Modern Make-Up Air Unit and insulated stainless chilled water piping facility
Engineered Since 2003 for Long-Term Facility Performance Cleanroom retrofits, energy-conscious MAU replacements, and durable stainless & copper utility systems.
Direct Contact & Inquiries

Discuss Your Next Project or Site Walkdown

Reach our Kuala Lumpur headquarters directly or build a structured quotation inquiry below.

Request an Engineering Quotation (RFQ)

Select the capabilities required for your facility and send a formatted project brief directly to cliffyapcs@thermologicaleng.com & tlogical@yahoo.com.